FY 2003 - 2004
Library renovations kept the library staff busy during the past year. Carpet was installed throughout the library during the summer of 2003, and a new HVAC system was installed during the summer of 2004. These changes required the relocation of all library inventory - which was completed by the library staff. Office furniture was also moved, and a temporary library was established on the second floor of the Administration Building. Teamwork was emphasized and the library staff truly demonstrated their commitment to students and faculty during this time of instability and change.
Response to Performance Standards
Notable Accomplishments
Circulation Report
Patron Attendance and Traffic Flow
Information Literacy
Reference Desk Statistics
Database Usage
Inventory Information
Budget Expenditures
|